Project Duration Calculator

Tested

Working days and finish date for a project from total effort, team size and daily hours.

Tested, not yet published. The formula for this calculator is implemented and passes its automated checks. This page stays non-indexable until it is reviewed and published.

Results

Enter your values and press Calculate. Results appear here.

  • • Result

Quick answer

Working days = ceil(effort ÷ (people × hours per day)), counting Monday to Friday. 100 person-hours with 2 people at 6 productive hours a day takes 9 working days: starting Monday 3 March 2025, it finishes Thursday 13 March, 11 calendar days.

Enter total effort, people, hours per day and a start date. The calculator returns working days and the finish date. Use this project duration calculator to check your own figures.

Related tools: Focus Session (Pomodoro) Calculator: How many focus sessions and breaks fit in the time you have. Hourly Productivity Calculator: Output per hour, time per unit and the hours needed to reach a target. Pomodoro Sessions Calculator: Number of focus sessions that fit in the time you have.

How to use the Project Duration Calculator

  1. Enter total effort (person-hours) (0.01 or more).
  2. Enter people working on it (a whole number, between 1 and 1000). It starts at 1.
  3. Enter productive hours per person per working day (between 0.1 and 24). It starts at 6.
  4. Pick start date.
  5. Press Calculate to see the result, and use Reset to start again.
Inputs of the Project Duration Calculator
InputWhat to enterAllowed values
Total effort (person-hours)A number≥ 0.01
People working on itA whole number≥ 1, ≤ 1000, starts at 1
Productive hours per person per working dayA number≥ 0.1, ≤ 24, starts at 6
Start dateA calendar date—

Formula and method

Formula

working days = ceil(effort ÷ (people × hours per day)); finish = the working day (Monday to Friday) on which the last of those days falls

IEEE-754 double precision; shown to at most 6 decimal places.

Divides total effort by the team's daily capacity and rounds up to whole working days, then counts Monday-to-Friday working days from the start date (a weekend start begins the next Monday). Holidays, ramp-up, dependencies and part-time availability are not modelled; add contingency yourself. Adding people shortens the estimate only when the work can truly be shared.

Worked examples

These examples are verified: each one is an automated test case that the live calculator must reproduce exactly.

Example 1

Inputs: Total effort (person-hours) = 100; People working on it = 2; Productive hours per person per working day = 6; Start date = 2025-03-03.

Results of example 1
ResultValue
Working days9
Finish date2025-03-13
Finish weekdayThursday
Calendar days from start11

Example 2

Inputs: Total effort (person-hours) = 45; People working on it = 1; Productive hours per person per working day = 8; Start date = 2025-03-07.

Results of example 2
ResultValue
Working days6
Finish date2025-03-14
Finish weekdayFriday
Calendar days from start8

Example 3

Inputs: Total effort (person-hours) = 37.5; People working on it = 3; Productive hours per person per working day = 5.5; Start date = 2025-03-08.

Results of example 3
ResultValue
Working days3
Finish date2025-03-12
Finish weekdayWednesday
Calendar days from start5

The first line is the headline result (working days). Below it the project Duration Calculator lists finish date, finish weekday and calendar days from start, which describe the same case from other angles. IEEE-754 double precision; shown to at most 6 decimal places.

Worked example

100 ÷ 12 = 8.33, rounded up to 9. Five days cover 3 to 7 March and four more 10 to 13 March.

Where this estimate stops applying

There is no holiday calendar, and effort is assumed divisible between people. Real projects add coordination overhead, so add a buffer.

How the result changes with total effort

Holding every other input at the first worked example, this table changes only total effort. It shows how sensitive the answer is to that one value; each row was produced by running this calculator.

How the result changes with total effort
Total effortWorking daysFinish dateFinish weekday
5052025-03-07Friday
10092025-03-13Thursday
200172025-03-25Tuesday
400342025-04-17Thursday

What happens with invalid input

These messages are produced by the calculator itself, so you know what to fix.

  • Total effort (person-hours): left empty shows "Enter total effort (person-hours)." beside that field and no result.
  • Start date: left empty shows "Enter start date." beside that field and no result.

Choosing between the Project Duration Calculator and similar calculators

Each row shows what a related calculator on this site asks for and what it returns, so you can pick the one that matches your question.

Choosing between the Project Duration Calculator and similar calculators
CalculatorYou enterIt returns
[Focus Session (Pomodoro) Calculator](/time/focus-time-calculator/)time available, focus session and short breakFocus sessions
[Hourly Productivity Calculator](/time/hourly-productivity-calculator/)units completed and hours workedUnits per hour
[Pomodoro Sessions Calculator](/time/pomodoro-sessions-calculator/)time available, focus session and short breakFocus sessions
[Study Schedule Calculator](/time/study-schedule-calculator/)first day of studying, exam date and total study hours neededHours per study day
[Time Allocation Calculator](/time/time-allocation-calculator/)total time, activity 1 and activity 2Activity 1

Background: dates and times

Date and time results depend on the conventions a tool uses: whether the end date counts, whether weekends and holidays are skipped, how months of different lengths are handled and whether time zones are applied. This page states its convention, and the worked examples show it.

Dates use the Gregorian calendar and calendar days unless the page says otherwise; check deadlines against the rule in your contract or regulation.

Assumptions and limitations

  • No holiday calendar
  • Assumes effort is perfectly divisible between people

If a required value is empty, not a number, or outside its allowed range, the form marks that field with a message and shows no result instead of a misleading number. The automated checks deliberately try invalid entries for total effort (person-hours) and start date to confirm this.

Frequently asked questions

What if I add a third person?

With three people, 100 person-hours at 6 hours a day need 100 ÷ 18 = 5.6, rounded up to 6 working days.

Do weekends count?

No. Working days are Monday to Friday only, so a project that runs over a weekend finishes later on the calendar.

Why 6 productive hours?

Meetings and breaks reduce an 8-hour day.

What does the Project Duration Calculator calculate?

Working days and finish date for a project from total effort, team size and daily hours. It returns Working days, Finish date, Finish weekday and Calendar days from start.

What formula does the Project Duration Calculator use?

working days = ceil(effort ÷ (people × hours per day)); finish = the working day (Monday to Friday) on which the last of those days falls. Divides total effort by the team's daily capacity and rounds up to whole working days, then counts Monday-to-Friday working days from the start date (a weekend start begins the next Monday).

What do I need to enter in the project Duration Calculator?

You enter Total effort (person-hours), People working on it, Productive hours per person per working day and Start date.

How is the result rounded or limited?

IEEE-754 double precision; shown to at most 6 decimal places. No holiday calendar.

What are the limits of this calculator?

No holiday calendar. Assumes effort is perfectly divisible between people.

What is an example of a project Duration result?

With total effort (person-hours) 100, people working on it 2, productive hours per person per working day 6 and start date 2025-03-03, the working days is 9.

Where does the method come from?

The method follows: Capacity arithmetic; Monday to Friday work week.

Sources

  • Capacity arithmetic; Monday to Friday work week

Content last reviewed 2026-11-04. Formulas and worked examples are checked by automated tests against independently computed values.