Skip to content
CalculatorAtlas

Concrete Mix Calculator

Tested

Cement, sand and aggregate for a nominal volume mix such as 1:2:4.

Tested, not yet published. The formula for this calculator is implemented and passes its automated checks. This page stays non-indexable until it is reviewed and published.

Results

Enter your values and press Calculate. Results appear here.

  • • Result

Quick answer

Dry volume = wet volume × dry-to-wet factor × (1 + waste), then each material is its share of the mix. One cubic yard of 1:2:4 concrete with a 1.54 factor and 5% waste needs 6.24 bags (94 lb) of cement, 12.47 ft³ of sand and 24.95 ft³ of coarse aggregate.

Enter the concrete volume, the nominal mix, the dry-to-wet factor and the waste allowance. The calculator returns cement, sand and aggregate.

Related tools: Concrete Weight Calculator: Weight of a volume of concrete from its density. Concrete Steps Calculator: Concrete volume for solid stacked steps. Concrete Volume Calculator: Cubic yards of concrete and bags needed for a slab, footing or pad.

How to use the Concrete Mix Calculator

  1. Enter volume of concrete (0.001 or more).
  2. Choose volume unit: Cubic yards, Cubic metres and Cubic feet.
  3. Choose nominal mix (cement : sand : aggregate): 1 : 1.5 : 3, 1 : 2 : 4 and 1 : 3 : 6.
  4. Enter dry-to-wet volume factor (between 1.2 and 1.8). It starts at 1.54.
  5. Enter allowance for waste (%) (between 0 and 50). It starts at 5.
  6. Press Calculate to see the result, and use Reset to start again.
Inputs of the Concrete Mix Calculator
InputWhat to enterAllowed values
Volume of concreteA number≥ 0.001
Volume unitChoose one: Cubic yards; Cubic metres; Cubic feetStarts at Cubic yards
Nominal mix (cement : sand : aggregate)Choose one: 1 : 1.5 : 3; 1 : 2 : 4; 1 : 3 : 6Starts at 1 : 2 : 4
Dry-to-wet volume factorA number≥ 1.2, ≤ 1.8, starts at 1.54
Allowance for waste (%)A number≥ 0, ≤ 50, starts at 5

Formula and method

Formula

dry volume = wet volume × factor × (1 + waste); each material = dry volume × its share of the mix; 94-lb bag of cement = 1 ft³

IEEE-754 double precision; shown to at most 6 decimal places.

Classic nominal-mix estimate by volume: loose dry materials occupy about 1.54 times the volume of the wet concrete they make (the voids fill when mixed), so the dry volume is split in the mix ratio. In US practice a 94-lb bag of Portland cement is counted as 1 cubic foot of loose cement. This estimates quantities only; it is not a mix design (water-cement ratio, strength, air entrainment and admixtures need a proper design to ACI 211 or local codes), and ready-mix or bagged mixes list their own yields. Add the water your supplier's instructions specify.

Worked examples

These examples are verified: each one is an automated test case that the live calculator must reproduce exactly.

Example 1

Inputs: Volume of concrete = 1; Volume unit = Cubic yards; Nominal mix (cement : sand : aggregate) = 1 : 2 : 4; Dry-to-wet volume factor = 1.54; Allowance for waste (%) = 5.

Results of example 1
ResultValue
Cement6.24 bags (94 lb)
Cement weight586 lb
Sand12.47 ft³ (0.46 yd³)
Coarse aggregate24.95 ft³ (0.92 yd³)
Total dry volume43.66 ft³
Wet volume of concrete27 ft³

Example 2

Inputs: Volume of concrete = 2.5; Volume unit = Cubic metres; Nominal mix (cement : sand : aggregate) = 1 : 1.5 : 3; Dry-to-wet volume factor = 1.54; Allowance for waste (%) = 10.

Results of example 2
ResultValue
Cement27.19 bags (94 lb)
Cement weight2,556 lb
Sand40.79 ft³ (1.51 yd³)
Coarse aggregate81.58 ft³ (3.02 yd³)
Total dry volume149.56 ft³
Wet volume of concrete88.29 ft³

Example 3

Inputs: Volume of concrete = 40; Volume unit = Cubic feet; Nominal mix (cement : sand : aggregate) = 1 : 3 : 6; Dry-to-wet volume factor = 1.5; Allowance for waste (%) = 0.

Results of example 3
ResultValue
Cement6 bags (94 lb)
Cement weight564 lb
Sand18 ft³ (0.67 yd³)
Coarse aggregate36 ft³ (1.33 yd³)
Total dry volume60 ft³
Wet volume of concrete40 ft³

The first line is the headline result (cement). Below it the concrete Mix Calculator lists cement weight, sand, coarse aggregate, total dry volume and wet volume of concrete, which describe the same case from other angles. IEEE-754 double precision; shown to at most 6 decimal places.

The 1:2:4 mix

The parts add to 7. One cubic yard is 27 ft³ wet; dry materials are 27 × 1.54 = 41.58 ft³, and with 5% waste 43.66 ft³. Cement is 1/7 of that, 6.24 ft³ (one 94 lb bag is about 1 ft³).

An estimate of materials

This is a volumetric estimate only. Strength depends on the water-cement ratio, aggregate grading and curing, and the dry-to-wet factor varies with the aggregates. For structural work use an engineered mix design or ready-mix.

How the result changes with volume of concrete

Holding every other input at the first worked example, this table changes only volume of concrete. It shows how sensitive the answer is to that one value; each row was produced by running this calculator.

How the result changes with volume of concrete
Volume of concreteCementCement weightSand
0.53.12 bags (94 lb)293 lb6.24 ft³ (0.23 yd³)
16.24 bags (94 lb)586 lb12.47 ft³ (0.46 yd³)
212.47 bags (94 lb)1,173 lb24.95 ft³ (0.92 yd³)
424.95 bags (94 lb)2,345 lb49.9 ft³ (1.85 yd³)

What happens with invalid input

These messages are produced by the calculator itself, so you know what to fix.

  • Volume of concrete: left empty shows "Enter volume of concrete." beside that field and no result.
  • Dry-to-wet volume factor: entering "1.0" shows "Dry-to-wet volume factor must be at least 1.2." beside that field and no result.

Choosing between the Concrete Mix Calculator and similar calculators

Each row shows what a related calculator on this site asks for and what it returns, so you can pick the one that matches your question.

Choosing between the Concrete Mix Calculator and similar calculators
CalculatorYou enterIt returns
[Concrete Weight Calculator](/construction/concrete-weight-calculator/)volume, volume unit and densityWeight
[Concrete Steps Calculator](/construction/concrete-steps-calculator/)number of steps, riser height and tread depthConcrete volume
[Concrete Volume Calculator](/construction/concrete-volume-calculator/)length, width and thicknessConcrete needed
[Post Hole Concrete Calculator](/construction/post-hole-concrete-calculator/)hole diameter, hole depth and post shapeConcrete per hole
[Concrete Block Fill Calculator](/construction/concrete-block-fill-calculator/)blocks with filled cores, core volume per block and waste allowanceFill needed

Background: construction estimates

Material quantities are geometry plus a margin. Calculate the exact volume or area, add an allowance for waste, spillage, cuts and uneven ground (calculator pages commonly mention 5 to 10 percent, a rule of thumb that varies by material and job) and round up to whole units. One cubic yard is exactly 27 cubic feet.

Suppliers often have minimum order sizes and may charge for small loads, so confirm quantities, product yields and local code with your supplier or a qualified estimator before ordering.

Assumptions and limitations

  • Volumetric estimate of materials only
  • The dry-to-wet factor varies with aggregate grading

Quantities are estimates. Add allowances for waste and site conditions, and follow local codes and a qualified professional's instructions for structural or safety-critical work.

If a required value is empty, not a number, or outside its allowed range, the form marks that field with a message and shows no result instead of a misleading number. The automated checks deliberately try invalid entries for volume of concrete and dry-to-wet volume factor to confirm this.

Frequently asked questions

What does 1:2:4 mean?

One part cement, two parts sand, four parts aggregate by volume.

How much water?

Enough for workability, typically a water-cement ratio near 0.5.

Is bagged mix easier?

For small jobs, yes.

What does the Concrete Mix Calculator calculate?

Cement, sand and aggregate for a nominal volume mix such as 1:2:4. It returns Cement, Cement weight, Sand, Coarse aggregate and Total dry volume.

What formula does the Concrete Mix Calculator use?

dry volume = wet volume × factor × (1 + waste); each material = dry volume × its share of the mix; 94-lb bag of cement = 1 ft³. Classic nominal-mix estimate by volume: loose dry materials occupy about 1.54 times the volume of the wet concrete they make (the voids fill when mixed), so the dry volume is split in the mix ratio.

What do I need to enter in the concrete Mix Calculator?

You enter Volume of concrete, Volume unit, Nominal mix (cement : sand : aggregate), Dry-to-wet volume factor and Allowance for waste (%).

How is the result rounded or limited?

IEEE-754 double precision; shown to at most 6 decimal places. Volumetric estimate of materials only.

What are the limits of this calculator?

Volumetric estimate of materials only. The dry-to-wet factor varies with aggregate grading.

What does the “Volume unit” option change?

It sets how the concrete Mix is worked out. The choices are Cubic yards, Cubic metres and Cubic feet.

What is an example of a concrete Mix result?

With volume of concrete 1, volume unit Cubic yards, nominal mix (cement : sand : aggregate) 1 : 2 : 4, dry-to-wet volume factor 1.54 and allowance for waste (%) 5, the cement is 6.24 bags (94 lb).

Where does the method come from?

The method follows: Nominal volumetric proportioning of concrete (dry-volume factor 1.52 to 1.57; 1.54 is the commonly used value); Portland Cement Association convention: a 94-lb bag of Portland cement is taken as 1 cubic foot of loose volume; ACI 211.1 for engineered mix design (not implemented here).

Can I rely on this calculator for a decision?

Quantities are estimates. Add allowances for waste and site conditions, and follow local codes and a qualified professional's instructions for structural or safety-critical work. For this calculator in particular: Volumetric estimate of materials only.

Sources

  • Nominal volumetric proportioning of concrete (dry-volume factor 1.52 to 1.57; 1.54 is the commonly used value)
  • Portland Cement Association convention: a 94-lb bag of Portland cement is taken as 1 cubic foot of loose volume
  • ACI 211.1 for engineered mix design (not implemented here)

Content last reviewed 2026-11-04. Formulas and worked examples are checked by automated tests against independently computed values.